{"id":712,"date":"2023-05-23T13:19:18","date_gmt":"2023-05-23T11:19:18","guid":{"rendered":"https:\/\/www.irf-europa.com\/services\/hot-repair\/"},"modified":"2023-10-10T17:28:30","modified_gmt":"2023-10-10T15:28:30","slug":"hot-repair","status":"publish","type":"page","link":"https:\/\/www.irf-europa.com\/en\/services\/hot-repair\/","title":{"rendered":"HOT REPAIR"},"content":{"rendered":"\n<div class=\"wp-block-group bglightgrey py-5\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<div class=\"wp-block-group container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<h1 class=\"wp-block-heading has-text-align-center mb-4\">Hot repair<\/h1>\n\n\n\n<p class=\"has-text-align-center\">The term \u201chot repair\u201d refers to a series of external operations programmed during the furnace production campaign aimed at extending its duration over the years. There are different types of hot interventions that can apply to the upperstructure as well as the glass contact zone.<\/p>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-group container py-5\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<div class=\"wp-block-columns my-5 is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading underline h3\"><strong><strong>Overcoating<\/strong><\/strong><\/h2>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>To avoid glass loss due to the wearing of materials in contact with the molten mass, AZS or Chrome tiles can be applied externally to compensate for the missing thickness.<\/p>\n\n\n\n<p>Worn out tiles can be replaced in turn thanks to controlled cooling of the glass inside the tank.<\/p>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity my-xl\"\/>\n\n\n\n<div class=\"wp-block-columns my-5 is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading underline h3\"><strong><strong><strong>Crown repairs to furnace and regenerators by installing suspended blocks\/hanging blocks<\/strong><\/strong><\/strong><\/h2>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>Holes that are created in the furnace and regenerator crowns can be repaired by installing suspended blocks attached to the external structures. In order to completely restore these areas and avoid further flame passages, it is possible to proceed following the installation of these blocks with internal or external ceramic welding, or with the external application of refractory cement suitable for high temperatures.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-jetpack-tiled-gallery aligncenter is-style-columns\"><div class=\"tiled-gallery__gallery\"><div class=\"tiled-gallery__row\"><div class=\"tiled-gallery__col\" style=\"flex-basis:100.00000%\"><figure class=\"tiled-gallery__item\"><a href=\"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/sequence1.jpg?ssl=1\" data-lbwps-width=\"1074\" data-lbwps-height=\"410\" data-lbwps-srcsmall=\"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/sequence1-730x279.jpg\"><img decoding=\"async\" srcset=\"https:\/\/i2.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/sequence1.jpg?strip=info&#038;w=600&#038;ssl=1 600w,https:\/\/i2.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/sequence1.jpg?strip=info&#038;w=900&#038;ssl=1 900w,https:\/\/i2.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/sequence1.jpg?strip=info&#038;w=1074&#038;ssl=1 1074w\" alt=\"\" data-height=\"410\" data-id=\"537\" data-link=\"https:\/\/www.irf-europa.com\/servizi\/hot-repair\/sequence1\/\" data-url=\"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/sequence1.jpg\" data-width=\"1074\" src=\"https:\/\/i2.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/sequence1.jpg?ssl=1\" data-amp-layout=\"responsive\"\/><\/a><\/figure><\/div><div class=\"tiled-gallery__col\"><figure class=\"tiled-gallery__item\"><a href=\"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/sequence2.jpg?ssl=1\" data-lbwps-width=\"891\" data-lbwps-height=\"451\" data-lbwps-srcsmall=\"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/sequence2-730x370.jpg\"><img decoding=\"async\" srcset=\"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/sequence2.jpg?strip=info&#038;w=600&#038;ssl=1 600w,https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/sequence2.jpg?strip=info&#038;w=891&#038;ssl=1 891w\" alt=\"\" data-height=\"451\" data-id=\"539\" data-link=\"https:\/\/www.irf-europa.com\/servizi\/hot-repair\/sequence2\/\" data-url=\"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/sequence2.jpg\" data-width=\"891\" src=\"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/sequence2.jpg?ssl=1\" data-amp-layout=\"responsive\"\/><\/a><\/figure><\/div><\/div><\/div><\/div>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity my-xl\"\/>\n\n\n\n<div style=\"height:0.5rem\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns my-5 is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading underline h3\"><strong><strong><strong>Anchoring unstable walls and refractory blocks, with inconel bars and hooks, to the external steel bracing<\/strong><\/strong><\/strong><\/h2>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>Installing Inconel bars attached to the external structure of the furnace counteracts further movement of intact blocks or fractured block parts. This technique is particularly recommended to inhibit unwanted movement and subsidence of plate blocks.<\/p>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity my-xl\"\/>\n\n\n\n<div class=\"wp-block-columns my-5 is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading underline h3\"><strong><strong><strong>Anchoring unstable walls and refractory blocks, with water cooled bars and hooks to the external steel bracing<\/strong><\/strong><\/strong><\/h2>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>The movement of the upperstructure blocks towards the inside of the furnace can be counteracted by installing water-cooled hooks. In this type of operation, IRF provides the entire anchoring and cooling sysyem.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-jetpack-tiled-gallery aligncenter is-style-square\"><div class=\"tiled-gallery__gallery\"><div class=\"tiled-gallery__row columns-2\"><div class=\"tiled-gallery__col\"><figure class=\"tiled-gallery__item\"><a href=\"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-1.jpg?ssl=1\" data-lbwps-width=\"876\" data-lbwps-height=\"669\" data-lbwps-srcsmall=\"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-1-730x558.jpg\"><img decoding=\"async\" srcset=\"https:\/\/i2.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-1.jpg?resize=600%2C600&#038;strip=info&#038;ssl=1 600w,https:\/\/i2.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-1.jpg?resize=669%2C669&#038;strip=info&#038;ssl=1 669w\" alt=\"\" data-height=\"669\" data-id=\"534\" data-link=\"https:\/\/www.irf-europa.com\/servizi\/hot-repair\/foto-1\/\" data-url=\"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-1.jpg\" data-width=\"876\" src=\"https:\/\/i2.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-1.jpg?ssl=1&amp;resize=669%2C669\" data-amp-layout=\"responsive\"\/><\/a><\/figure><\/div><div class=\"tiled-gallery__col\"><figure class=\"tiled-gallery__item\"><a href=\"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-2.jpg?ssl=1\" data-lbwps-width=\"1027\" data-lbwps-height=\"685\" data-lbwps-srcsmall=\"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-2-730x487.jpg\"><img decoding=\"async\" srcset=\"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-2.jpg?resize=600%2C600&#038;strip=info&#038;ssl=1 600w,https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-2.jpg?resize=685%2C685&#038;strip=info&#038;ssl=1 685w\" alt=\"\" data-height=\"685\" data-id=\"535\" data-link=\"https:\/\/www.irf-europa.com\/servizi\/hot-repair\/foto-2\/\" data-url=\"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-2.jpg\" data-width=\"1027\" src=\"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-2.jpg?ssl=1&amp;resize=685%2C685\" data-amp-layout=\"responsive\"\/><\/a><\/figure><\/div><\/div><\/div><\/div>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity my-xl\"\/>\n\n\n\n<div class=\"wp-block-columns my-5 is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading underline h3\"><strong><strong><strong>Reconstructing walls and\/or replacing blocks<strong><\/strong><\/strong><\/strong><\/strong><\/h2>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>When the upperstructures are compromised due to significant wear or partial collapse, it is possible to rebuild these areas when hot, without shutting down the furnace.<\/p>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-jetpack-tiled-gallery aligncenter is-style-square\"><div class=\"tiled-gallery__gallery\"><div class=\"tiled-gallery__row columns-5\"><div class=\"tiled-gallery__col\"><figure class=\"tiled-gallery__item\"><a href=\"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-1-1.jpg?ssl=1\" data-lbwps-width=\"908\" data-lbwps-height=\"655\" data-lbwps-srcsmall=\"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-1-1-730x527.jpg\"><img decoding=\"async\" srcset=\"https:\/\/i2.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-1-1.jpg?resize=600%2C600&#038;strip=info&#038;ssl=1 600w,https:\/\/i2.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-1-1.jpg?resize=655%2C655&#038;strip=info&#038;ssl=1 655w\" alt=\"\" data-height=\"655\" data-id=\"547\" data-link=\"https:\/\/www.irf-europa.com\/servizi\/hot-repair\/foto-1-1\/\" data-url=\"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-1-1.jpg\" data-width=\"908\" src=\"https:\/\/i2.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-1-1.jpg?ssl=1&amp;resize=655%2C655\" data-amp-layout=\"responsive\"\/><\/a><\/figure><\/div><div class=\"tiled-gallery__col\"><figure class=\"tiled-gallery__item\"><a href=\"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-2-1.jpg?ssl=1\" data-lbwps-width=\"911\" data-lbwps-height=\"649\" data-lbwps-srcsmall=\"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-2-1-730x520.jpg\"><img decoding=\"async\" srcset=\"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-2-1.jpg?resize=600%2C600&#038;strip=info&#038;ssl=1 600w,https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-2-1.jpg?resize=649%2C649&#038;strip=info&#038;ssl=1 649w\" alt=\"\" data-height=\"649\" data-id=\"546\" data-link=\"https:\/\/www.irf-europa.com\/servizi\/hot-repair\/foto-2-1\/\" data-url=\"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-2-1.jpg\" data-width=\"911\" src=\"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-2-1.jpg?ssl=1&amp;resize=649%2C649\" data-amp-layout=\"responsive\"\/><\/a><\/figure><\/div><div class=\"tiled-gallery__col\"><figure class=\"tiled-gallery__item\"><a href=\"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-3.jpg?ssl=1\" data-lbwps-width=\"895\" data-lbwps-height=\"644\" data-lbwps-srcsmall=\"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-3-730x525.jpg\"><img decoding=\"async\" srcset=\"https:\/\/i1.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-3.jpg?resize=600%2C600&#038;strip=info&#038;ssl=1 600w,https:\/\/i1.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-3.jpg?resize=644%2C644&#038;strip=info&#038;ssl=1 644w\" alt=\"\" data-height=\"644\" data-id=\"545\" data-link=\"https:\/\/www.irf-europa.com\/servizi\/hot-repair\/foto-3\/\" data-url=\"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-3.jpg\" data-width=\"895\" src=\"https:\/\/i1.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-3.jpg?ssl=1&amp;resize=644%2C644\" data-amp-layout=\"responsive\"\/><\/a><\/figure><\/div><div class=\"tiled-gallery__col\"><figure class=\"tiled-gallery__item\"><a href=\"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-4.jpg?ssl=1\" data-lbwps-width=\"868\" data-lbwps-height=\"641\" data-lbwps-srcsmall=\"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-4-730x539.jpg\"><img decoding=\"async\" srcset=\"https:\/\/i1.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-4.jpg?resize=600%2C600&#038;strip=info&#038;ssl=1 600w,https:\/\/i1.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-4.jpg?resize=641%2C641&#038;strip=info&#038;ssl=1 641w\" alt=\"\" data-height=\"641\" data-id=\"544\" data-link=\"https:\/\/www.irf-europa.com\/servizi\/hot-repair\/foto-4\/\" data-url=\"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-4.jpg\" data-width=\"868\" src=\"https:\/\/i1.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-4.jpg?ssl=1&amp;resize=641%2C641\" data-amp-layout=\"responsive\"\/><\/a><\/figure><\/div><div class=\"tiled-gallery__col\"><figure class=\"tiled-gallery__item\"><a href=\"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-5.jpg?ssl=1\" data-lbwps-width=\"925\" data-lbwps-height=\"683\" data-lbwps-srcsmall=\"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-5-730x539.jpg\"><img decoding=\"async\" srcset=\"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-5.jpg?resize=600%2C600&#038;strip=info&#038;ssl=1 600w,https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-5.jpg?resize=683%2C683&#038;strip=info&#038;ssl=1 683w\" alt=\"\" data-height=\"683\" data-id=\"543\" data-link=\"https:\/\/www.irf-europa.com\/servizi\/hot-repair\/foto-5\/\" data-url=\"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-5.jpg\" data-width=\"925\" src=\"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2023\/02\/foto-5.jpg?ssl=1&amp;resize=683%2C683\" data-amp-layout=\"responsive\"\/><\/a><\/figure><\/div><\/div><\/div><\/div>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity my-xl\"\/>\n\n\n\n<div class=\"wp-block-columns my-5 is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading underline h3\"><strong><strong><strong><strong><strong>Replacing upperstructure channel blocks<\/strong><\/strong><\/strong><\/strong><\/strong><\/h2>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>Generally, upperstructure channel blocks are subject to deep fractures that can compromise the entire stability of the structure and the quality of the finished product. Using special lifting systems, damaged blocks can be removed and replaced with new ones. IRF carries out this type of operation even when a crane or overhead crane is not available in the vicinity.<\/p>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity my-xl\"\/>\n\n\n\n<div class=\"wp-block-columns my-5 is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading underline h3\"><strong><strong><strong><strong><strong><strong>Bottom repair: installing AZS stones or chips<\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/h2>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>If the bottom of the furnace has worn areas, it is possible to restore the thickness of these areas and prevent further wear by installing refractory stones. This technique is advantageous in that it is not necessary to drain the glass inside the tank.<\/p>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity my-xl\"\/>\n\n\n\n<div class=\"wp-block-columns my-5 is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading underline h3\"><strong><strong><strong><strong><strong><strong><strong>Hot Bottom Repair<\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/h2>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>The purpose of this type of intervention is to restore the thickness of the bottom of a furnace using a special self-levelling refractory cement for high temperatures. After draining the tank, this cement is applied with ad-hoc cooled lances.<\/p>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity my-xl\"\/>\n\n\n\n<div class=\"wp-block-columns my-5 is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading underline h3\"><strong><strong><strong><strong><strong><strong><strong>Bottom Pumping Injection<\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/h2>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>An IRF patent after years of testing The purpose is to solve the problem of large cross or float furnaces where access to the sides is limited. After drainage, the worn areas are repaired with self-levelling refractory cement using ad hoc injections directly from the bottom.<\/p>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity my-xl\"\/>\n\n\n\n<div class=\"wp-block-columns my-5 is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading underline h3\"><strong><strong><strong><strong><strong><strong><strong>Thermal cleaning<\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/h2>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>Sulphates deposited over time inside the stacks formed by the regeneration chamber checkers cause an increase in pressure and, consequently, accelerated furnace wear. By using gas-air lances designed specifically to reduce the thermal stress of the rider arches, these sulphates can be melted and drained into the base (from where they can then be removed), restoring normal pressure conditions.<\/p>\n\n\n\n<p>In order to eliminate any risks from the use of gas, our system uses a unit to safely control and manage the gas flows.<\/p>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity my-xl\"\/>\n\n\n\n<div class=\"wp-block-columns my-5 is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h2 class=\"wp-block-heading underline h3\"><strong><strong><strong><strong><strong><strong><strong><strong>ShotCreting<\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/h2>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>Using a special high-pressure pump, refractory cement can be hot (or cold) applied in order to create new protective and insulating layers.<\/p>\n<\/div>\n<\/div>\n\n\n\n<p><\/p>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Hot repair The term \u201chot repair\u201d refers to a series of external operations programmed during the furnace production campaign aimed&hellip;<\/p>\n<p><a class=\"btn btn-dark btn-sm websoup-read-more-link\" href=\"https:\/\/www.irf-europa.com\/en\/services\/hot-repair\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":643,"parent":702,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-templates\/empty.php","meta":{"inline_featured_image":false,"footnotes":""},"class_list":["post-712","page","type-page","status-publish","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>HOT REPAIR - IRF Europa<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.irf-europa.com\/en\/services\/hot-repair\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"HOT REPAIR - IRF Europa\" \/>\n<meta property=\"og:description\" content=\"Hot repair The term \u201chot repair\u201d refers to a series of external operations programmed during the furnace production campaign aimed&hellip;Read More...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.irf-europa.com\/en\/services\/hot-repair\/\" \/>\n<meta property=\"og:site_name\" content=\"IRF Europa\" \/>\n<meta property=\"article:modified_time\" content=\"2023-10-10T15:28:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2021\/10\/hot-repair.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.irf-europa.com\\\/en\\\/services\\\/hot-repair\\\/\",\"url\":\"https:\\\/\\\/www.irf-europa.com\\\/en\\\/services\\\/hot-repair\\\/\",\"name\":\"HOT REPAIR - IRF Europa\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.irf-europa.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.irf-europa.com\\\/en\\\/services\\\/hot-repair\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.irf-europa.com\\\/en\\\/services\\\/hot-repair\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/www.irf-europa.com\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/hot-repair.jpg?fit=2000%2C1500&ssl=1\",\"datePublished\":\"2023-05-23T11:19:18+00:00\",\"dateModified\":\"2023-10-10T15:28:30+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.irf-europa.com\\\/en\\\/services\\\/hot-repair\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.irf-europa.com\\\/en\\\/services\\\/hot-repair\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.irf-europa.com\\\/en\\\/services\\\/hot-repair\\\/#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/www.irf-europa.com\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/hot-repair.jpg?fit=2000%2C1500&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/www.irf-europa.com\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/hot-repair.jpg?fit=2000%2C1500&ssl=1\",\"width\":2000,\"height\":1500},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.irf-europa.com\\\/en\\\/services\\\/hot-repair\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.irf-europa.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Services\",\"item\":\"https:\\\/\\\/www.irf-europa.com\\\/en\\\/services\\\/?lang=en\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"HOT REPAIR\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.irf-europa.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.irf-europa.com\\\/en\\\/\",\"name\":\"IRF Europa\",\"description\":\"Riparazione e manutenzione di forni per la fusione del vetro\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.irf-europa.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.irf-europa.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.irf-europa.com\\\/en\\\/#organization\",\"name\":\"IRF Europa\",\"url\":\"https:\\\/\\\/www.irf-europa.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.irf-europa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/www.irf-europa.com\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/irf-europa.png?fit=752%2C248&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/www.irf-europa.com\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/irf-europa.png?fit=752%2C248&ssl=1\",\"width\":752,\"height\":248,\"caption\":\"IRF Europa\"},\"image\":{\"@id\":\"https:\\\/\\\/www.irf-europa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/irf-europa-srl\\\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"HOT REPAIR - IRF Europa","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.irf-europa.com\/en\/services\/hot-repair\/","og_locale":"en_US","og_type":"article","og_title":"HOT REPAIR - IRF Europa","og_description":"Hot repair The term \u201chot repair\u201d refers to a series of external operations programmed during the furnace production campaign aimed&hellip;Read More...","og_url":"https:\/\/www.irf-europa.com\/en\/services\/hot-repair\/","og_site_name":"IRF Europa","article_modified_time":"2023-10-10T15:28:30+00:00","og_image":[{"width":2000,"height":1500,"url":"https:\/\/www.irf-europa.com\/wp-content\/uploads\/2021\/10\/hot-repair.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.irf-europa.com\/en\/services\/hot-repair\/","url":"https:\/\/www.irf-europa.com\/en\/services\/hot-repair\/","name":"HOT REPAIR - IRF Europa","isPartOf":{"@id":"https:\/\/www.irf-europa.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.irf-europa.com\/en\/services\/hot-repair\/#primaryimage"},"image":{"@id":"https:\/\/www.irf-europa.com\/en\/services\/hot-repair\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2021\/10\/hot-repair.jpg?fit=2000%2C1500&ssl=1","datePublished":"2023-05-23T11:19:18+00:00","dateModified":"2023-10-10T15:28:30+00:00","breadcrumb":{"@id":"https:\/\/www.irf-europa.com\/en\/services\/hot-repair\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.irf-europa.com\/en\/services\/hot-repair\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.irf-europa.com\/en\/services\/hot-repair\/#primaryimage","url":"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2021\/10\/hot-repair.jpg?fit=2000%2C1500&ssl=1","contentUrl":"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2021\/10\/hot-repair.jpg?fit=2000%2C1500&ssl=1","width":2000,"height":1500},{"@type":"BreadcrumbList","@id":"https:\/\/www.irf-europa.com\/en\/services\/hot-repair\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.irf-europa.com\/en\/"},{"@type":"ListItem","position":2,"name":"Services","item":"https:\/\/www.irf-europa.com\/en\/services\/?lang=en"},{"@type":"ListItem","position":3,"name":"HOT REPAIR"}]},{"@type":"WebSite","@id":"https:\/\/www.irf-europa.com\/en\/#website","url":"https:\/\/www.irf-europa.com\/en\/","name":"IRF Europa","description":"Riparazione e manutenzione di forni per la fusione del vetro","publisher":{"@id":"https:\/\/www.irf-europa.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.irf-europa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.irf-europa.com\/en\/#organization","name":"IRF Europa","url":"https:\/\/www.irf-europa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.irf-europa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2021\/10\/irf-europa.png?fit=752%2C248&ssl=1","contentUrl":"https:\/\/i0.wp.com\/www.irf-europa.com\/wp-content\/uploads\/2021\/10\/irf-europa.png?fit=752%2C248&ssl=1","width":752,"height":248,"caption":"IRF Europa"},"image":{"@id":"https:\/\/www.irf-europa.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/irf-europa-srl\/"]}]}},"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.irf-europa.com\/en\/wp-json\/wp\/v2\/pages\/712","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.irf-europa.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.irf-europa.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.irf-europa.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.irf-europa.com\/en\/wp-json\/wp\/v2\/comments?post=712"}],"version-history":[{"count":6,"href":"https:\/\/www.irf-europa.com\/en\/wp-json\/wp\/v2\/pages\/712\/revisions"}],"predecessor-version":[{"id":950,"href":"https:\/\/www.irf-europa.com\/en\/wp-json\/wp\/v2\/pages\/712\/revisions\/950"}],"up":[{"embeddable":true,"href":"https:\/\/www.irf-europa.com\/en\/wp-json\/wp\/v2\/pages\/702"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.irf-europa.com\/en\/wp-json\/wp\/v2\/media\/643"}],"wp:attachment":[{"href":"https:\/\/www.irf-europa.com\/en\/wp-json\/wp\/v2\/media?parent=712"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}